Skip to main content

Project Spotlight Update: Framing in Progress

Phase: Structural Framing & Foundation Work

We’re moving right along on this beautiful home addition! The framing for both the floor system and roof structure is now complete, setting the stage for the next phases of construction.

Scope of Work:

✔️ Structural block walls have been built and reinforced

✔️ Floor beams and framing are securely set on concrete piers

✔️ Roof trusses are installed and braced, ready for decking

✔️ Foundation and slab extensions poured and cured

This stage is all about strength, alignment, and precision — ensuring the foundation and framing are solid and built to last.

Stay tuned as we move into the next step: roof decking, sheathing, and exterior tie-ins!

From ground-up builds to complete renovations, we bring your vision to life with craftsmanship and care.

https://axiaconst.com/

(813) 434-3107 | License #CGC1536451