Framing is officially complete on this two-story addition. What started as lines on a plan is now a fully defined structure — walls stood, openings set, and the roofline in place.
Scope of work completed:
✔️ Full structural framing (first + second story)
✔️ Floor system installed and squared up
✔️ Roof framing set — shape and pitch locked in
✔️ Window and door openings framed for future install
✔️ ZIP System sheathing installed to tighten up the exterior and prep for dry-in
✔️ Interior layout taking shape with clear room flow and transitions
Up next:
✔️ Site clean-up
✔️ ZIP tape application to seal seams and complete the moisture/air barrier
✔️ Rough trades: electrical, plumbing, and HVAC
Strong framing sets the tone for everything that follows — straight lines, clean openings, and a build that stays disciplined all the way to finishes.
At AXIA Construction, it’s the details that make the difference.