Our AXIA Construction team has completed the structural phase of this 3-car garage addition and covered rear porch expansion. The footprint is locked in, framing is complete, and the exterior shell is fully tied together and ready for the next stage.
✔️ Full structural framing
✔️ Roof system installed
✔️ ZIP system sheathing in place
✔️ Openings framed clean and square
✔️ Site graded and cleaned
✔️ Passed framing inspection
With the structure standing strong and lines tight, we now transition into exterior finishes — lath, stucco, and paint — while interior trades begin their work inside.
Strong shell. Clean execution. Ready for the next phase.
At AXIA Construction, it’s the details that make the difference.