Our AXIA Construction team has completed the structural phase of this 3-car garage addition and covered rear porch expansion. The footprint is locked in, framing is complete, and the exterior shell is fully tied together and ready for the next stage.
Scope:
✔️ Full structural framing
✔️ Roof system installed
✔️ ZIP system sheathing in place
✔️ Openings framed clean and square
✔️ Site graded and cleaned
✔️ Passed framing inspection
With the structure standing strong and lines tight, we now transition into exterior finishes — lath, stucco, and paint — while interior trades begin their work inside.
Strong shell. Clean execution. Ready for the next phase.
At AXIA Construction, it’s the details that make the difference.
https://axiaconst.com
(813) 434-3107 | License #CGC1536451
