Skip to main content

New Residential Build — Phase 5 of 6 - Zephyrhills, FL

Slab Finished. Walls Going Up.

Another key milestone reached Zephyrhills.

The slab has officially passed inspection, been poured, finished, and cured — and now we’re moving vertically with block work in progress.

From foundation to structure — this is where the building starts to truly take shape.

Scope:

✔️ Slab inspection passed

✔️ Concrete poured + finished

✔️ Cure process completed

✔️ Block work underway — footprint becoming walls

A solid slab is more than just concrete — it’s precision, elevation control, and structural discipline. Everything that follows depends on it.

Next up:

✔️ Block inspection

✔️ Fill cell / lintel pump

✔️ Framing

At AXIA Construction, it’s the details that make the difference.

https://axiaconst.com

(813) 434-3107 | License #CGC1536451