Big progress on our Zephyrhills custom home: the slab is poured, finished, and cured and now the CMU block walls are up and moving fast, with clean openings and a layout you can finally “walk through.”
Scope:
✔️ Slab complete + cured
✔️ CMU walls set with rough openings established
✔️ Site staying clean and organized as we push forward
Next up:
✔️ Block inspection
✔️ Fill cell / lintel pump
✔️ Framing kickoff
Structure first. Everything else gets easier when the bones are right.
At AXIA Construction, it’s the details that make the difference.
https://axiaconst.com
(813) 434-3107 | License #CGC1536451
