This barndominium is taking shape fast. With the shell insulated and the interior structure moving, we’re framing out the first-floor layout and building up the second-floor system to lock in the home’s footprint, flow, and function.
Scope:
✔️ Insulated building shell for comfort, efficiency, and long-term performance
✔️ First-floor interior framing to define rooms, walls, and key living spaces
✔️ Second-floor framing in progress—floor system set and structure building upward
✔️ Stair framing underway to connect levels safely and cleanly
✔️ Openings and layout dialed in to keep everything square, straight, and ready for the next trades
The result so far: A clearly defined first-floor plan with the second level coming together—setting the foundation for rough-ins and interior finishes.
Next up: Continue second-floor framing and stair completion, then roll into MEP rough-ins and the next phase of interior buildout.
At AXIA Construction, it’s the details that make the difference.