This Tampa Residential Home Addition is moving fast—clean slab prep, CMU block set, and the structure is now ready for the next phase. From layout to lintel pump, we’ve been focused on solid foundations and straight, tight lines to set the buildup for success.
Scope & Progress Highlights:
✔️ Slab prep completed and ready for buildout
✔️ CMU block walls installed for a strong structural envelope
✔️ Lintel pump completed to lock in openings and support loads
✔️ Site kept clean and staged for efficient trade flow
The result so far: a properly prepped slab and a sturdy block structure—with framing next as we move into the next phase of construction.
At AXIA Construction, it’s the details that make the difference.