Skip to main content

Retail Center Rebuild | Demolition, Storefront Masonry & Roof Framing

From selective demolition to the new retail shell, this video shows how the storefront and roof structure took shape.

Progress Highlights

✔️ An excavator removed sections of the existing roof and walls.

✔️ New concrete block walls and piers defined the storefront openings along the street.

✔️ Aerial footage shows the steel roof framing spanning the retail bays behind the storefront.

Next Up

At the stage shown, the exterior walls and roof framing were in place. Roof decking was the next step toward drying in the building.

Built Right. Worth More.

https://axiaconst.com/

(813) 434-3107 | License #CGC1536451